Public TestsYour infrastructure. Help shape the future of RackDocs.Apply with your team

01 / STRUCTURE

Give your infrastructure a clear structure.

The first step is to establish where equipment is located and which client its documentation belongs to. RackDocs organises this context into a hierarchy that later connects devices, ports and cables.

WHAT THE ADMINISTRATOR GAINS

The team finds equipment within a client and location, using a shared vocabulary instead of reconciling names across separate spreadsheets.

01 / STRUCTURE

From a client to a mounting place

An organisation maintains infrastructure grouped by client. A client can represent a customer company or a separate documentation scope. Within each client, you create locations, then racks and named off-rack mounting places.

A location code, name and description provide a common reference. The same context appears on device records, cable endpoints, topology and reports. A cable can connect different racks and locations within the same client.

Location list for DEMO — NextGT MultiSite: WAW, WOL and BEM. Click to enlarge.

02 / STRUCTURE

Review racks before entering the server room

The rack list takes you from a location to an individual enclosure. Codes, names, height in U and device counts help identify the correct rack. Its record then expands this overview into mounting and connection views.

Agree on one naming convention for locations and racks. A label such as WAW-NET becomes a recognisable part of the infrastructure address in records, on printed labels and when speaking to an engineer on site.

Four demonstration racks with location, height and device count. Click to enlarge.

03 / STRUCTURE

Equipment does not have to live in a rack

Named mounting places describe a desk, wall, storage area, room or another installation point. The inventory can therefore include equipment that does not belong at a particular U position.

This is useful for access points, edge equipment and IT or OT infrastructure outside a conventional server room. The asset still belongs to a location and can have ports, connections, custom parameters and a QR identifier.

Off-rack mounting places: technical storage and a reception point at a demonstration location. Click to enlarge.

Practical workflow

Prepare an inventory for three branches

  1. Create a client and agree on location codes.
  2. Register rack heights and named mounting places for equipment outside racks.
  3. Assign devices to these places, then document their ports and connections.
Understanding the scope

Locations and mounting places are documentation records. Creating them does not automatically discover devices or check their presence on the network.

Screenshots come from the working RackDocs application and show a demonstration environment with fictional infrastructure. They include selected views and screen details; the application is evolving. Screenshots retain the Polish interface in this English guide.

PUBLIC TESTS / TELL US ABOUT YOUR ENVIRONMENT

Try RackDocs in your own scenario.

RackDocs is in Internal final test. Apply for Public Tests and describe the infrastructure you want to organise. We will contact you about joining the public test edition.

Join Public Tests
Open full-size screenshot ↗